This page is not fully translated, yet. Please help completing the translation.
(remove this paragraph once the translation is finished)
The MES-Terminal is the main interface for processing orders. In the figure below, an order is already in progress. As long as no order has been set up, the Start button is located above the order data, which can be used to set up the next order. The elements of the menu interface are explained below.


Only the required number of pieces plus an operator-specific overproduction quantity can be produced for each order. Subsequently, the production approval is withdrawn from the plant.

The manual declaration of NOK components has no influence on the finished parts and packaging units reported under Packaging. If NOK parts are declared, these are first deducted from the current HU to be filled (here finished parts in carton). Additional NOK parts, which exceed the current HU, have no influence on the counters shown under Packaging. If more NOK parts are declared than there are parts in the current HU, the Parts in carton counter does not continue to count until the actual number of OK parts exceeds the reported finished parts. The MES-Terminal therefore assumes that the packaging units that have already been filled and labeled accordingly are first refilled with the new parts.

Packing units can be nested as desired. The HU of the smallest category always contains the product itself. Above this, theoretically, there can be different number of categories into which packaging units of the next smaller category are packed. This information is defined in the current order.
If there is an unfinished HU of the smallest category, this HU will be declared as completed first at the HU completed button. If the production is stopped the next HU complete message would declare the HU of category 2 completed (otherwise the filling of the next HU of category 1 is started automatically). At each subsequent HU completed message, the next higher category HU is then reported as completed until finally the main HU (HU of the highest category) is reported as completed.
If the current main HU is reported as completed during ongoing production (an HU of category 1 is filled), the button early main HU completion message can be used.
LLL
back to HU Fertigmeldung