{{indexmenu_n>6}} ====== FuBa F - Material Container Request ====== ===== General ===== At the start of an order, this module brings the input materials (components) to the unit (initial request). The ERP system decides how much starting material is transported to the work center for an initial request. The order quantity is determined from all production orders that have been scheduled in a sequence in the detailed planning tool. If the first container is already sufficient for the production quantity, only one container is delivered to the work center. If the components of a container are used up, a repeat order is also reported to the ERP system via this module. In the case of a repeat order, each time only one container is delivered to the work center. ===== Transfer Parameters ===== |<60% 20% 15% 65%>| ^Variable Name ^Type ^Content| ^Object IT_BANF| |ASTART |String |X = initial request, otherwise reorder| |AUFNR |String |order number| |MATNR |String |material number| |PDATU |String |delivery date| |PRVBE |String |unit name| |PZEIT |String |delivery time| |RSNUM |String |reservation number| |RSPOS |String |reservation position| |STUECK |String |number of pieces, for repeat order | |WERKS |String |plant number| ===== Return Parameters ===== |<60% 20% 15% 65%>| ^Variable Name ^Type ^Content| ^General| |EV_Error |String |X=error occurred| ===== Return Value ===== The return value is //AA_FEHLERTEXT//, a variable of data type String. It contains more detailed information about the error in case of an error. If //EV_ERROR// does not show an error, other status messages can also be located here. Therefore //EV_ERROR// must be evaluated for error checking and not only //AA_FEHLERTEXT//.